Client: MDF Group Project: Hastings Pde North Bondi Location: North Bondi NSW Scope: Grind and apply SikaDur and Combiflex
Concrete Topping
Ausgrid Zone Substation
by Ken Penfold | Mar 14, 2017 | Ausgrid Zone, Concrete Repair, Concrete Topping, Projects, Protective Coating
Client: MDF Group Project: Ausgrid Zone Substation Location: Bass Hill NSW Scope: Concrete topping and repairs
Recent Posts
Categories
- 4Malabar Alliance
- Abrasive Blasting
- Ausgrid Zone
- Blog
- Carbon Fibre Reinforced Polymer
- Carbon Fibre Reinforced Strengthening
- Case Study
- Cheminova Manufacturing
- Coca Cola Amatil
- Concrete Repair
- Concrete Repairs
- Concrete Topping
- Crack Injection
- Dam
- Epoxy Coating
- Featured Case Study
- Featured Products
- Featured Structure
- Gosford City Council
- Insights
- Joint Sealing
- Leak Sealing
- Main Feature
- manhole rehabilitation
- Projects
- Protective Coating
- Public Works NSW
- Reinforced Concrete
- Sewerage Infrastructure
- Storm and Wastewater Infrastructure
- Swimming Pool
- The Tasman Tank co.
- UGL
- Uncategorized
- Veolia Water Solutions
- Waste Water Treatment
- Water Storage
- Water Treatment Plant